Skip to content

iOS and Android mobile app developmentShrink first.
Then grow.

The first version solves one flow end to end. Typical duration is 8-16 weeks, and the store review timeline is planned around it. Backend, admin panel and release process sit with the same team.

09:41

Today’s jobs

Tuesday · 3 jobs waiting

MK
PendingCompleted

AC maintenance

Next

Ataşehir · 10:30

Boiler fault

Kadıköy · 13:00

Routine check

Maltepe · 15:30

Today’s route

3 stops · 24 km

Start job
Sample interface · fictional field service app

Scope

Do-it-all first versions
ship late.

The idea list is always long. The first version solves only the most valuable flow end to end, and the rest gets in line based on user data. This is the most effective way to lower the cost.

First version · one flow

  1. 01Login
  2. 02Job list
  3. 03Job details
  4. 04Photo proof
  5. 05Customer signature

Later versions · based on data

  • Chat
  • Live map
  • Stock tracking
  • Invoicing
  • Ratings
  • Multi-language
  • Calendar sync
  • Timesheet report
  • Voice notes
  • Dark mode
  • Badges
  • Customer portal
  • AI assistant
Sample list · fictional scenario

Flow

One flow from launch
to first value.

Every step the user takes, from opening the app to finishing the task, on one map. The screens are designed on top of this map.

  1. 09:41

    Sample Service

    0532 ••• •• ••
    Send code

    01 Login

  2. 09:41

    Today’s jobs

    AC maintenance

    Ataşehir · 10:30

    Boiler fault

    Kadıköy · 13:00

    Routine check

    Maltepe · 15:30

    Start job

    02 Job list

  3. 09:41

    AC maintenance

    Ataşehir · 10:30

    Filter cleaning

    Gas pressure check

    Drain check

    Complete steps

    03 Job details

  4. 09:41

    Add photo

    Continue

    04 Photo proof

  5. 09:41

    Sign-off

    The service will be marked as complete.

    Complete job

    05 Signature

First value · job completed

Platform

One codebase.
Two stores.

For most first versions, targeting iOS and Android with one codebase is enough and economical. Native is recommended when heavy hardware or performance is needed. The decision is made during discovery.

One codebaseiOS + Android

screens/ 5 screens · one flow

api/ jobs.ts · auth.ts

theme.ts

Native · for heavy hardware needs

09:41

Today’s jobs

Tuesday · 3 jobs waiting

MK
PendingCompleted

AC maintenance

Next

Ataşehir · 10:30

Boiler fault

Kadıköy · 13:00

Routine check

Maltepe · 15:30

Today’s route

3 stops · 24 km

Start job

iOS

09:41

Today’s jobs

Tuesday · 3 jobs waiting

MK
PendingCompleted

AC maintenance

Next

Ataşehir · 10:30

Boiler fault

Kadıköy · 13:00

Routine check

Maltepe · 15:30

Today’s route

3 stops · 24 km

Start job

Android

System

An app does not
work alone.

Behind it are a backend, an API and an admin panel. When the technician closes the job, the panel updates and a notification goes to the customer. All in the same team, on the same plan.

panel.example-service.com
Job assignmentAdmin panel
JobAreaStatus
AC maintenanceAtaşehirCompleted
Boiler faultKadıköyOn the way
Routine checkMaltepeWaiting
Technician: M. Kaya
  • API
  • Database
  • Notifications
  • Analytics
  • Crash tracking
Sample scenario · fictional

Release

Going live in the stores
is part of the job.

Developer accounts are opened in your name. Store texts, images and the review process are included in the delivery.

App Store · Google PlayIn reviewLive
SS

Sample Service

Sample Company Inc.

09:41

Today’s jobs

AC maintenance

Ataşehir · 10:30

Boiler fault

Kadıköy · 13:00

Routine check

Maltepe · 15:30

Start job
09:41

AC maintenance

Ataşehir · 10:30

Filter cleaning

Gas pressure check

Drain check

Complete steps
09:41

Sign-off

The service will be marked as complete.

Complete job
  1. Developer accountIn your name
  2. Store listingDescription and images
  3. ReviewStore approval
  4. ReleaseIn both stores

Measurement

Not downloads.
Retention.

Success is measured not by downloads but by users who reach the first moment of value and by 90-day retention. Notifications, analytics and crash tracking are set up in the first version.

InstallFirst loginFirst valueDay 7Day 30Day 90ACTIVATIONRETENTION

Activation
Users who reach the first moment of value

Retention
Users still active on day 90

Schematic view, not data.

Short answer

In mobile app development, the biggest decision behind the cost is scope. USFORM first narrows the MVP scope and, following a one platform, one flow principle, typically reaches the first working version in 8-16 weeks. Growth is planned with data.

Scope

What is in a mobile app project?

What you get

  1. 01MVP scope design and flow chart
  2. 02iOS and Android development (native or cross-platform)
  3. 03Backend, admin panel and API
  4. 04Notifications, analytics and crash tracking
  5. 05App Store and Google Play release process
  6. 06Post-release iteration plan

Who it is for

  • Brands that want to open a mobile channel for their loyal customers
  • Companies that need an internal app for a field team or dealer network
  • Startups that want to validate a product idea in the app stores
  • Businesses that want to bring their web app to mobile

Problems it solves

  • There is an app idea, but scope and cost are unclear
  • There is no measurable way to compare agency quotes
  • Backend, admin panel and store work sit with different vendors
  • The first version was planned too big, so the release keeps slipping

Last updated: September 29, 2026

Platform decision

Native, cross-platform or PWA: which one fits you?

Choosing a platform is a question of need first and technology second. How often your users will open the app, which device features you need and what budget range you have: these three answers largely decide the choice.

A phone outline drawn in thin lines with a neon green data line flowing into the screen, conceptual illustration
Conceptual illustration

You have four paths: separate native apps for the two stores, a cross-platform app with one codebase, a PWA that runs in the browser and is added to the home screen, and packaging your current website as it is. The fourth is in the table only as a warning, because store rules reject it in most cases.

The table below reads each option through the same five questions. Device and store information is based on Apple, Google, Flutter and React Native documentation, and PWA information on MDN and WebKit sources.

Comparison of mobile platform options
OptionWhen it makes senseIn the store and on the deviceTeam and maintenanceMain risk
Native (Swift and Kotlin)When heavy hardware use, top-level performance and a platform-specific experience are neededA separate app per platform, full access to device featuresTwo separate codebases and two separate skill setsCost and duration of the first version go up
Cross-platform (Flutter, React Native)Most first versions. When you want to release the same product in both stores on a limited budgetRelease in both stores from a shared codebase. Device features are reached through native modulesOne codebase, one teamIf a very specific device feature is needed, a native module is written for that part
PWA (app running in the browser)If use is mostly in the browser, being in the stores is not a must and you want to validate the idea quicklyNot listed in the stores, added to the home screen. On iOS, web push came with iOS 16.4 and works only for apps added to the home screenRun by a web team, no store processCapabilities and limits on iOS may change, check the current state before deciding
Packaging the site as it isAlmost neverApp Store rule 4.2: a repackaged website does not count as enough for minimum functionalityLooks cheapRisk of rejection and a wasted timeline

Sources: Apple, Google, Flutter, React Native, MDN, WebKit. Details in the Sources section at the end of the page.

If you do not need an app

If your users will open the app once a month, if there is no need for capabilities such as the camera, location or background work, and notifications are not essential, a well-built web app is often enough. We say so openly during discovery. The right answer is not always an app in the stores.

See the web app development page

USFORM's default approach

For most first versions we recommend a cross-platform approach with one codebase. That means the same product in both stores, one team and one maintenance plan. If there are heavy hardware or performance needs, we add native modules or write that part fully native. The decision is made during discovery, after your needs are written down.

Scope

MVP does not mean the same thing in the market as it does for us

The word MVP on a quote does not tell you what you will get. Comparing prices without seeing the scope in writing is misleading.

We reviewed agency pricing pages published in September 2026. The prices of packages labeled MVP vary widely. The reason is simple: some quotes define an MVP as a clickable demo, others as a working product released in the stores.

Our definition is the second one. The first working version is the version a real user can download from the store and use to complete the one main flow from start to finish. The backend and the admin panel are included, because an app without a panel can be released but not managed.

Typical split between the first working version and later phases
TopicPhase 1: first working versionLeft to later phases
User flowOne main flow, working from start to finishSecondary flows and rarely used screens
PlatformiOS and Android, one codebaseTablet-specific interfaces
Admin panelBasic panel for user and content managementAdvanced reporting and bulk actions
NotificationsBasic notifications if neededCampaign notifications by segment
PaymentsOne payment method if neededMultiple payment methods and subscription setups
MeasurementActivation and crash trackingAdvanced funnel and cohort analysis

This is a typical split. The scope of every project is set in writing during discovery.

How do you move to the second phase?

The move between phases is not decided by download numbers. It is based on the share of users who reach the first moment of value (activation) and the share still using the app after 90 days (retention). Both measures are set up in Phase 1, and the second phase's scope is written from this data.

This approach also protects the budget. You do not build a feature that will go unused in the first version, and you grow the features that are used, with data.

Examples

What does a first working version look like in practice?

The three scenarios below are fictional. They do not describe a real client, they show how we set the scope of the first phase.

  • Example scenario · fictional

    Field service team

    Situation
    Technicians receive work orders over WhatsApp and on paper forms. Head office calls to ask what stage a job is at.
    Approach
    Phase 1 builds one flow: receive the work order, add photos and notes on site, complete the job. The admin panel shows work orders and their status.
    Outcome
    Head office sees job status in the panel. Features such as stock and customer signature move to Phase 2 based on first usage data.
  • Example scenario · fictional

    Appointments and customer loyalty

    Situation
    A clinic takes appointments by phone. There are no reminders, and returning patients are not tracked separately.
    Approach
    Phase 1 builds booking, cancellation and a reminder notification. The appointment record goes to the CRM together with its source.
    Outcome
    Each appointment request is recorded with its source. Campaign notifications and the loyalty setup wait for the next phase.
  • Example scenario · fictional

    B2B dealer orders

    Situation
    Dealers send orders over WhatsApp, and the price list circulates as a PDF. Order tracking is in Excel.
    Approach
    Phase 1 builds the catalog, dealer-specific pricing and order creation. Orders land in the admin panel.
    Outcome
    Orders come together in one place. ERP and payment integration are planned as a separate phase once the first phase is seen working.

Budget

Eight factors that shape the budget

The number of screens alone does not explain the cost. Two apps with the same number of screens can differ in cost several times over because of the system behind them.

On published pricing pages we see figures that vary widely under the same mobile app label. Most of them do not state the method, the scope or whether tax is included. That is why we do not give a single market price table. Instead, we show which item changes the budget, why, and in which phase we handle it.

Factors that shape a mobile app budget
FactorWhy it changes the budgetPhase where it is usually handled
Number of screens and flowsEvery screen means design, development and testing. The number of flows matters more than the number of screensOne main flow in Phase 1, the rest in later phases
User rolesEach role, such as customer, staff and manager, brings its own permissions and screen setOne or two roles in Phase 1
Login and account managementEmail, phone and social login bring different workloads. Apps where users create an account also need in-app account deletion (App Store 5.1.1)Phase 1
Backend and admin panelIf data, users and content are managed from a panel outside the app, a separate product is builtBasic panel in Phase 1
IntegrationsEvery connection to a CRM, ERP, payment provider or your existing website is a separate work itemThe single most critical integration in Phase 1, the rest in later phases
Notifications and offline useThe notification setup and storing data without a connection need extra architectureNotifications in Phase 1 if needed, offline scope set during discovery
Design depthA simple interface with ready-made components and brand-specific interaction and animation are different jobsSimple and consistent in Phase 1, fine-tuning in a later phase
Testing and the store processDevice variety, review rounds and privacy forms add to the timeline and the budgetPhase 1, release included

What sits outside the development fee

Our quote covers the development fee. Store developer accounts (as of September 29, 2026, 99 US dollars a year or the local currency equivalent for Apple and a one-time 25 US dollars for Google Play), server and service subscriptions, and SMS, map and notification services are listed separately. These are itemized in the discovery report.

Method

What is delivered at each stage, and what do we need from you?

A mobile project is long and has many parts. Knowing each stage's output and the input expected from you, from the start, protects the timeline.

  1. 01

    Discovery and scope

    The idea list is split into the first version and later phases. You are expected to describe the target user, the one main scenario and your existing systems.

    DeliverableScope document, phase plan and itemized budget.

  2. 02

    Flow and screen design

    The user's path to the first moment of value is drawn on one map. Screens are designed on that map and approved with you. You are expected to provide your brand files and timely feedback.

    DeliverableFlow map and approved screen designs.

  3. 03

    Development

    The app, backend and admin panel are built by the same team on the same plan. A working demo is shown every week. You are expected to make decisions at the demos.

    DeliverableTestable build, crash tracking and analytics setup.

  4. 04

    Store preparation and release

    Developer accounts are opened in the name of the app's owner. Privacy forms and store texts are prepared, and review rounds are managed. You are expected to provide the account holder's personal or company details and, if any, your D-U-N-S status.

    DeliverableThe released app. You own the store account.

  5. 05

    After release

    A monthly iteration is planned from analytics and user feedback. The second phase's scope is written from activation and retention data.

    DeliverableWritten monthly scope plan.

Stores

The store release process: what makes the timeline longer?

Finished code does not mean a release. Store accounts, privacy forms and review rounds take more time than expected in most projects.

A single neon green line passing through two thin rectangular gates, with a small orange node between them, conceptual illustration
Conceptual illustration
Apple App Store and Google Play compared, as of September 29, 2026
TopicApple App StoreGoogle Play
Developer account fee99 US dollars a year or the local currency equivalent. Non-profit organizations can apply for a fee waiver25 US dollars, one time
Account and identityAn organization account requires a D-U-N-S number, legal entity status, binding authority, an email on the company domain and a working websitePersonal and organization account types are available
Mandatory testing before releaseThe requirement in this row is specific to GooglePersonal accounts opened after November 13, 2023 need a closed test with at least 12 testers for at least 14 days before going to production
Privacy declarationApp privacy information and a privacy policy URL in App Store Connect. Data from third-party SDKs is includedData safety form and a privacy policy link. SDKs are included, and a false declaration can lead to the app being removed
Mandatory technical versionSince April 28, 2026, apps uploaded to App Store Connect must be built with Xcode 26 and the iOS 26 SDKFrom August 31, 2026, new apps and updates must target Android 16 (API 36) or higher. Extensions can be requested until November 1, 2026
Common rejection reasons2.1 completeness, 4.2 minimum functionality, 5.1.1 privacy, 3.1.1 in-app purchase for digital contentPrivacy and Data safety declarations that do not match the app

Fees and rules change. The relevant official page is checked again before release.

In whose name should the account be opened?

The store account should be opened in the name of the person or company that owns the app. Having the account opened in the agency's name makes the app dependent on the agency. If you want to change agencies, transferring the app can be hard and slow. With us, the account is opened in your name and you are the account owner. Our team gets the narrowest access the work requires through user roles in the store consoles, and this is reviewed when the project ends.

An Apple organization account requires a D-U-N-S number. If you do not have one, you need to get it first, and that time is added to the project timeline. Because the time it takes varies by application, we do not give an exact figure here. The exact timeline is written during discovery, after your account status is seen.

Why does packaging the site as it is cause problems?

App Store rule 4.2 does not accept a repackaged website or a collection of links as enough for minimum functionality. An app is expected to offer value on the device that differs from the browser. A project that packages its site and sends it to the store gets stuck in review rounds, and the release timeline stretches.

System

Backend, notifications, payments and personal data

The system behind the screens outlives the rest of the app and often takes more work.

  • Backend and admin panel

    Users, content and orders are managed from a panel outside the app. The panel is part of the first version, because an app without a panel can be released but not run.

  • Notifications

    In native apps, notifications go through platform services. In a PWA on iOS, notifications have worked since iOS 16.4, but only for apps added to the home screen. The need for notifications affects the platform choice.

  • Payments

    For apps that sell digital content or subscriptions, App Store 3.1.1 requires in-app purchase. Different rules apply to selling physical goods and services, and which applies to you is clarified during discovery.

  • Integration and measurement

    Records and events from the app can flow into the CRM, automation flows and reports. USFORM's experience in these layers makes it possible to connect the app to the rest of the business.

Personal data and KVKK

KVKK is the Turkish Personal Data Protection Law. If the app collects personal data, users are shown a privacy notice explaining what the data is collected for. Where explicit consent is needed, consent is taken with a text separate from the notice, before the data is collected. The two are not combined into a single checkbox. Apple also requires consent before data is collected and a way to withdraw it (App Store 5.1.1).

The main points to watch in mobile apps are: asking for location, notification, camera and contacts permissions when they are needed and with a reason, having a way to delete the account inside the app, declaring third-party SDKs both in the store forms and in the privacy notice, and assessing servers or services that run abroad separately. The provisions on transferring personal data abroad changed on June 1, 2024, so server and SDK locations are written down at the start of the project.

This section is not legal advice. We recommend working with a legal advisor on your app's data processing scope. For current obligations and penalties, see the texts published by the Turkish Personal Data Protection Authority. We do not give article numbers or penalty amounts here, because they change.

Three empty app screens with rounded corners, a single neon green line between them and a small orange node on the last screen, conceptual illustration
Conceptual illustration

After release

After release: maintenance and mandatory version compliance

The work does not end when the app is released. The stores ask for a new target version and new build tools every year, and operating systems ship new versions.

Two examples in effect today: from August 31, 2026, Google Play requires new apps and updates to target Android 16 (API 36). Since April 28, 2026, Apple expects apps uploaded to App Store Connect to be built with Xcode 26 and the iOS 26 SDK. Requirements like these renew every year, so maintenance is not an option, it is part of the timeline.

A thin neon green orbit line circling a small phone outline, with a small orange node moving along the orbit, conceptual illustration
Conceptual illustration
Maintenance items and their rhythm
ItemWhat is doneRhythm
Mandatory version complianceTarget API level and build tools are updated to the store calendarYearly, tied to the store calendar
Security and dependency updatesLibraries and SDKs are kept current with security patchesOngoing
Crash and performance monitoringCrash reports are read and recurring issues go on the priority listEvery release
Store policy changesPrivacy forms and declarations are reviewed after policy changesAs needed
New feature iterationScope is planned in writing from analytics and user feedbackMonthly, recommended

We do not give a percentage for maintenance. On published pages we see conflicting, unsourced figures for maintenance rates. Instead, we present the maintenance scope in writing and item by item, so it is clear what you are paying for.

Risks

Six common mistakes and red flags in quotes

These do not point to a specific company. They show the questions to ask when reading quotes and running a project.

Six mistakes that put a project in trouble

  • Putting every feature in the first version

    The longer the list, the later the release. A first version that reaches users lets later decisions rest on data.

  • Leaving the admin panel to the end

    The app gets released, but content and users cannot be managed. The panel should be part of the first version.

  • Having the agency open the store account

    The app's owner should be the account owner. Otherwise, changing agencies becomes a serious obstacle.

  • Packaging the site as it is

    It gets stuck in review rounds because of App Store rule 4.2. The app needs a function that offers value on the device.

  • Leaving the privacy declaration to release day

    Apple's privacy information and Google's Data safety form cover SDKs too. If these forms do not match the app, the release can be blocked.

  • Not writing the handover into the contract

    The transfer of source code, design files, the store account and server access should be in writing from the start.

Red flags to watch for in quotes

  • No written scope, only a price

    A price without a list of screens, roles, integrations and phases cannot be compared.

  • Unclear handover terms

    If the contract does not clearly say who will own the source code and the accounts, problems follow.

  • Undefined maintenance and support

    Who will fix what after release, and how fast, should be in writing.

  • Key clauses missing from the contract

    Acceptance testing, intellectual property and personal data clauses should be in the contract. We recommend having a legal advisor read them.

Preparation

What to prepare before asking for a quote

Every item on this list helps quotes come back more accurate and comparable. It does not need to be complete, even a one-sentence answer helps.

  • Who is the target user, and in what situation will they open the app?
  • What is the one main scenario? At which step will the user see the first value?
  • Which existing systems will the app talk to: website, CRM, ERP, payments?
  • Roughly which screens and which user roles will there be?
  • Are your brand files (logo, colors, typeface) ready?
  • In whose name, or which company's name, will the store account be opened?
  • Does your company have a D-U-N-S number, or does it need to get one?
  • Do you have a draft privacy policy, and which personal data will the app collect?
  • How will you measure success in the first version? How do you define activation?
  • What is your budget range and your target release date?

Glossary

Short glossary

MVP
The first working version. The first product released in the stores, in which a real user can complete the one main flow from start to finish.
Native app
An app written for one platform with that platform's own language and tools. Swift for iOS, Kotlin for Android.
Cross-platform
An approach that produces both iOS and Android apps from one codebase. Flutter and React Native are the best known.
PWA
A web app that runs in the browser, can be added to the home screen and can offer some capabilities offline.
Backend
The server side that runs behind the app. User accounts, data and business rules are managed here.
API
An interface that handles data exchange between the app and the backend, or between different systems.
SDK
A ready-made software development kit used to connect a service to the app. Analytics and notification services are examples.
Activation
The moment a user sees the first value in the app. It is defined per product, for example placing the first order.
Retention
The share of users still using the app after a set period. On this page it is measured on day 90.
Phase gate
A criterion that must be met before moving to the next phase, for example activation and retention targets.

Limits

What we don't promise

  • We do not guarantee store approval. Apple and Google run the review, and its duration and outcome are not in our control.
  • We do not promise download numbers or revenue. Success is measured by activation and retention.
  • Store account fees, server and service subscriptions are outside the development fee.
  • Games, hardware-connected apps and regulated apps are assessed separately.
  • We do not give legal advice. For KVKK and contract texts, consult your legal advisor.

Proof

Proof of product development.

Our own products and live tools. We state their stage as it is.

Quote

Priced by scope, in phases.

There is no fixed package price. The number of platforms and the depth of the backend are clarified during discovery, and the cost and deliverables of each phase are given in writing. Send the form and we will write the first version's scope and quote.

Request a quote

What shapes the quote

  • Backend depth and the admin panel
  • Integrations with your existing systems
  • Real-time features and payments
  • Number of platforms: iOS, Android or both
  • Number of screens, flows and user roles

Cost is driven less by the number of screens and more by backend depth, integrations, real-time features, payments and the number of platforms.

Process

How it works

First working version in 8-16 weeks. Store account preparation and review rounds are added to the timeline based on scope and account status. The exact timeline is written during discovery.

  1. Start

    Discovery and scope

    The idea list is split into the first version and later phases.

  2. Design

    Flow and screens

    The user's path to the first moment of value is drawn on one map.

  3. Development

    App, backend, panel

    All three are built by the same team, on the same plan.

  4. 8-16 weeks

    First working version and store release

    Account preparation and review rounds are added to the timeline based on scope.

  5. After release

    Iteration

    A monthly cycle driven by analytics and user feedback.

Assessment request

Mobile App Pre-Analysis

Send the short form and we will get back to you within one business day with our first findings on your idea, your scope and your budget range.

  • 2-minute form
  • Reply within 1 business day
  • No sales pressure

Prefer to talk instead? Call +90 532 450 75 14.

Frequently asked questions

Mobile app development: frequently asked questions

  • Less the number of screens and more the depth of the backend, integrations, real-time features, payments and the number of platforms. Narrowing the scope is the most effective way to lower the cost.

Sources

The official information on this page is based on the sources below. Fees and rules can change, so check the source before you decide.

Other services in the Build layer